Froedtert Hospital Blue Parking Structure
- 1 day ago
- 2 min read
Location: Milwaukee, Wisconsin
Award: High Performance
Project Team
Owner: Froedtert Hospital
Contractor: CG Schmidt
Architect: EUA – Milwaukee
Engineer: Graef
Concrete: Riv/Crete Ready Mix
Slag Cement: St Marys Cement

Located in Milwaukee, Wisconsin, the Froedtert Hospital Blue Parking Structure is a five-story facility providing 2,400 parking spaces designed to enhance the experience for patients, visitors, and staff. This thoughtful design includes a climate-controlled pedestrian bridge, accessible parking near elevators, and critical safety and sustainability features.
For a massive post-tensioned structure like this, the construction schedule lived and died by early strength gain. The team utilized a slag cement replacement rate that was specifically optimized to hit 3,000 psi in just 20 hours. This allowed for a rapid and consistent post-tensioning sequence, ensuring the project stayed on track while still comfortably exceeding the 28-day requirement of 6,000 psi.
Slag cement was the clear choice over other supplementary materials because of its remarkable consistency. Even with a complex chemical cocktail of admixtures, including corrosion inhibitors and viscosity modifiers, the slag-based mix remained stable and predictable. This reliability was crucial for the team as they used maturity meters to time their post-tensioning across variable weather conditions over the multi-year build.
The thixotropic properties of the slag mix also improved pumpability, which was essential for a project that occasionally required multiple pump stages to reach the upper levels. By reducing permeability and ensuring consistent air entrainment, slag cement has provided the foundation for a structure designed with a 75-year service life. The Froedtert Blue Parking structure stands as a premier example of how slag cement delivers the precision and durability required for high-stakes healthcare infrastructure.
Application Type
Application Type | Slab mix | Exterior Columns & Shear Walls |
% Slag Cement Replacement | 15 | 10 |
% Portland Cement | ||
% Portland Limestone Cement | 85 | 80 |
% Other SCM (if applicable) | Carbon Cure; VMA, CI, Super, Mid-Range, AE, Hyd. Stab. | Fly Ash (10) |
Aggregate | Combined Aggregate: ¾ gravel, 3/8 pea stone & sand; for pumpability & workability | Combined Aggregate: ¾ gravel, 3/8 pea stone & sand; for pumpability |
Water/cement ratio | 0.38 typ (max 0.4 per ACI F3) | 0.40 |
7-day strengths | 5700 psi, 3000 psi @ 20hr for PT | 5200 psi |
28-day strengths | 6000 psi required, 7300 psi typical | 5000 psi required, 6500 typical |