UA-91961844-1
top of page

Ohio DOT IR 70 and SR 29 Interchange and Roundabout

Apr 7, 2025
1 min read

Location: West Jefferson, Ohio

Award: Infrastructure


Project Team

Owner: Ohio Department of Transportation

Contractor: Eagle Bridge Co

Concrete: Ohio Ready Mix Slag Cement: St Marys Cement



This Ohio Department of Transportation (ODOT) project was constructed on State Route 29 (SR 29) at Interstate 70 (I-70) in Jefferson Township and the Village of West Jefferson in Madison County, OH, USA. The project included a new SR 29 bridge over I-70, a second roundabout at the SR 29 intersection at the I-70 eastbound exit/entrance ramps, pavement widening, drainage improvements, and the addition of a second lane to the existing roundabout at SR 29 and I-70. Slag cement was used in the concrete mixtures to achieve low permeability and high albedo.


Application Type

Application Type


% Slag Cement Replacement


% Portland Cement


% Portland Limestone Cement


% Other SCM (if applicable)


Aggregate


Water/cement ratio


7-day strengths


28-day strengths



1 Comment


The game FNAF Online is quite an addiction once you have learned how to play it properly. First, everything seems confusing because you need to get familiar with the cameras, sounds, characters, timing, and other details of the gameplay. However, after a couple of tries, you learn to see certain patterns and make better decisions.

Like
bottom of page