River Sol
Updated: Apr 12, 2025
Location: Bend, Oregon
Award: Architectural
Project Team
Owner: Scott May
Contractor: Timberline Construction
Architect: Tozer Design
Concrete (Place and Finish): Harrison Construction, LLC
Concrete: Hooker Creek Companies, LLC
Slag Cement: Ash Grove Cement

The owner of this project desired a low-impact, low-carbon home overlooking the Deschutes River in central Oregon, USA. The home’s polished concrete interior floor, the 74 ft (23 m) radius concrete stem wall, and a multi-level concrete patio are key aspects of the stunning architectural design. The project’s foundations, interior slabs-on-ground, exterior walls, and paving were constructed using concrete mixtures with slag cement comprising 60 to 70% of the total cementitious materials contents. The colored patio was a more conventional 3/8 in. (10 mm) exposed aggregate design, with 15% slag cement in a mixture with a total cementitious materials content of 564 lb/yd3 (335 kg/m3).
Application Type
Application Type | |
% Slag Cement Replacement | |
% Portland Cement | |
% Portland Limestone Cement | |
% Other SCM (if applicable) | |
Aggregate | |
Water/cement ratio | |
7-day strengths | |
28-day strengths |

8xbet com mình vừa lướt một chút, chưa đọc kỹ nên chỉ nói vài thứ đập vào mắt thôi nhé. Mình thường ngại mấy trang mới vì nhìn một hồi vẫn không biết nên xem từ đâu, nhưng ở đây các phần được tách riêng nên cũng dễ theo dõi. Không phải kiểu vừa mở lên là thấy mọi thứ chen chúc rồi muốn thoát ra ngay. Có đoạn mình chỉ kéo qua chứ không đọc, lúc quay lại vẫn nhận ra chỗ vừa xem nhờ từng khối nội dung khá rõ. Menu thì dễ thấy, mình không phải loay hoay tìm khi muốn chuyển sang mục khác. Chắc do mình thích cách sắp xếp đơn giản nên để ý…
Thấy B33 được chèn vào và được mọi người nhắc tới nhiều. Mình bấm xem cho biết, để xem cách trình bày và cấu trúc nội dung. Lướt nhanh thì thấy tổng thể khá gọn gàng, tạo cảm giác đáng tin cậy. Với mình, chỉ cần nội dung gọn gàng như vậy là đủ để mình nắm bắt thông tin cơ bản.
Seeing the stem wall described as a 74 ft radius made me picture how much formwork and planning that curve alone required, and it's impressive that the whole thing still hit 60 to 70% slag cement. I've been reading up on how replacement rates affect set times on curved pours, and https://trustlycasinolist.com happened to have some practical notes on timing and finishing that lined up with what I was wondering. Did the crew run into any issues keeping that radius consistent while working with the slower-setting mix?
hay88 mình vừa lướt qua một lúc, chưa đọc kỹ nên cũng chỉ để ý cách trang bày các mục ra thôi. Có cái khá hợp ý mình là nhìn không bị ngợp, mỗi nhóm nội dung có khoảng riêng chứ không chen hết vào một chỗ. Bình thường gặp trang nào nhiều thứ sát nhau quá là mình hơi ngại xem tiếp, vì cứ phải dừng lại tìm xem đang ở mục nào. Ở đây thì mới mở lên cũng dễ nhận ra các phần, không cần ngồi dò lâu. Mình xem khá nhanh nên chưa có nhận xét gì về nội dung, chỉ thấy phần trình bày vừa mắt, đơn giản vậy lại tiện. Menu nằm ở vị…
Thấy SUNWIN được chèn vào và được mọi người nhắc tới nhiều. Mình bấm xem cho biết, để xem cách trình bày và cấu trúc nội dung. Lướt nhanh thì thấy tổng thể khá gọn gàng, tạo cảm giác đáng tin cậy. Với mình, chỉ cần nội dung gọn gàng như vậy là đủ để mình nắm bắt thông tin cơ bản.